Log in
Sign up for FREE
arrow_back
Library

AST Frac Level 1

star
star
star
star
star
Last updated about 2 years ago
97 questions
Note from the author:
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
FE1 frac
1) For numbers >1,000, add a comma as no comma will mark the answer as wrong.
2) All numbers should be reported with 2 decimal places. Ex: 1.00, not 1.
3) Include units in your answer when appropriate. (psi, gal, bbl, lbs, gpt, rpm)
Question 1
1.

Question 2
2.

If flush is 325 bbls, how many gallons is that?

Question 3
3.

If 1,000 gallons of acid are pumped, how many barrels is that?

Question 4
4.

Find the density of slurry if the target concentration is 1.25 ppg.

Question 5
5.

What is the hydrostatic pressure if max concentration was 2.00 ppg and max rate was 100 bpm? ISIP was 3,550 psi and bottom hole pressure was 9,578 psi on flush.

Question 6
6.

Question 7
7.

Find the wellbore volume, in barrels, of #17 5.50" casing with a bottom perforation @ 15,678'.

Question 8
8.

Question 9
9.

If you have a frac gradient of 0.88 and a TVD of 8,674' what is the bottom hole pressure?

Question 10
10.

Question 11
11.

Question 12
12.

If 38,329 lbs of 36% (really 35.21%) acid is delivered, how much 15% acid will we have on location?

Question 13
13.

Question 14
14.

How much FR is pumped, on flush, if it has a setpoint of 0.75 and 325 slurry barrels were pumped?

Question 15
15.

Question 16
16.

Find the total RPMs of the augers if there is a clean rate of 99.7 bbl/min at a concentration of 0.75 ppg and the PPR is at a 30 lbs/rev.

Question 17
17.

Question 18
18.

What is the maximum rate that can go through iron if it has an OD of 4" and ID of 3.8"?

Question 19
19.

Question 20
20.

How much horsepower is our fleet running if average is pressure is 8,250 psi @ 101.1 bpm?

Question 21
21.

Question 22
22.

Explain what hydraulic fracturing is.

Question 23
23.

What is the purpose of hydraulic fracturing?

Question 24
24.

Draggable itemarrow_right_altCorresponding Item
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
Question 25
25.
Draggable itemarrow_right_altCorresponding Item
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
Question 26
26.

What is the difference between pressure A & B

Question 27
27.

Question 28
28.

Question 29
29.

Question 30
30.

Question 31
31.

What are the hoses on the discharge side of the blender hooked to?

Question 32
32.

Question 33
33.

What is an ISO?

Question 34
34.

Question 35
35.

Question 36
36.

How does sand get from the silos/sand kings to the blender tub?

Question 37
37.

Question 38
38.

Question 39
39.

Question 40
40.

Describe what the treater means when he asks the blender tender for boost

Question 41
41.

Question 42
42.

What does it mean when a pump operator asks for PTO?

Question 43
43.

Question 44
44.

Question 45
45.

Describe the difference between pressure A and pressure B

Question 46
46.

What does it mean if a treater tells you the down time was due to replacing a rubber?

Question 47
47.

What does it mean the fluid tech is getting a "strap"

Question 48
48.

Describe what the treater means when he tells the blender tender to go to 1 pound.

Question 49
49.

Describe the difference between preflush and flush.

Question 50
50.

Describe what is the purpose of a pump in frac operations.

Question 51
51.

Describe what a blender does in frac operations.

Question 52
52.

Explain the purpose of the missile during frac operations.

Question 53
53.

Describe ISIP and how to find it.

Question 54
54.

Draggable itemarrow_right_altCorresponding Item
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
Question 55
55.

Draggable itemarrow_right_altCorresponding Item
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
Question 56
56.

What is the difference between formation breakdown and acid breakdown?

Question 57
57.

Question 58
58.

Question 59
59.

What is the difference between 100 mesh sand and 40/70 sand?

Question 60
60.

Question 61
61.

Question 62
62.

Question 63
63.

Question 64
64.
Frac operation order:
Close zipper/wellhead
Close bleed-off valves
_______
Equalize to opening pressure
Follow frac schedule
Close zipper/wellhead
_______
Question 65
65.

Question 66
66.

Question 67
67.
Draggable itemarrow_right_altCorresponding Item
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
arrow_right_alt
Question 68
68.
Other Answer Choices:
Acid Breakdown
Ball Seat
Formation Breakdown
Question 69
69.

Question 70
70.

Question 71
71.

Question 72
72.

Question 73
73.

Question 74
74.

Question 75
75.

Question 76
76.

How much sand is in the silo if it is at 47%?

Question 77
77.

Question 78
78.

Question 79
79.

Question 80
80.

Question 81
81.

Question 82
82.

Question 83
83.

Question 84
84.

Question 85
85.

Question 86
86.

Question 87
87.

Question 88
88.

Question 89
89.

Question 90
90.

Question 91
91.

Question 92
92.

Question 93
93.

Question 94
94.

Question 95
95.

Question 96
96.

Question 97
97.

Please find the Hydrostatic Pressure at TVD if we are pumping a sand concentration of 1.75ppg.
2,671.56 psi
2,799.64 psi
2,682.17 psi
2,531.18 psi
Find the FG is the well has an ISIP of 2500 psi and a TVD of 5500', assume the well was flushed with fresh water.
0.85
0.81
0.90
0.88
Find the clean rate when you are pumping at a rate of 100bpm with a sand concentration of 0.75ppg. Assume the SG of the sand is 2.65
98.0 bpm
100.0 bpm
95.7 bpm
96.7 bpm
What is the bottom hole pressure if you are on 1.75ppg and the wellhead is currently at 8,788 psi? TVD of the well is 9,647'.
13,265.9 psi
13,473.9 psi
13,406.1 psi
13,290.5 psi
How much proppant did you pump if you pumped 1,267 bbls of slurry at 1.75 ppg?
50,908 lbs
86,284 lbs
93,125 lbs
74,742 lbs
If 9,126 gals of 36% acid is ordered and it needs to be diluted to 15%, how many barrels of water needs to be delivered first?
336 bbls
342 bbls
285 bbls
299 bbls
At what rate, in gpm, is FR being pumped during the initial pad if rate is 109.6 bpm and FR loading is at 1.0 gpt?
4.6 gpm
4.4 gpm
2.3 gpm
4.2 gpm
How many suction hoses do you need, attached to the blender, if the target rate is 110 bpm at 2.5 ppg concentration?
11 hoses
15 hoses
12 hoses
10 hoses
How many discharge hoses do you need, attached to the blender, if the target rate is 110 bpm at 2.5 ppg concentration?
10 hoses
12 hoses
15 hoses
11 hoses
How much fuel do we have on location if we have 10,000 gal in the frac tanks and 20 pumps on location? *Assume fuel tanks are at 75%
16,000 gal
18,000 gal
14,000 gal
20,000 gal
Label the parts of this frac location.
6
Frac Pumps
5
Proppant Storage (Sand Silos, Sandkings, etc.)
9
Fluid Storage (Water Transer, Frac Tanks, Water Silos, etc.)
7
Wellheads/Zipper manifold
3
Pumpdown unit
8
Wireline Crane
2
Manifold (Missile, Monoline, etc.)
4
Chemical Units (Chemadd, Chemical Trailer, Totes, etc.)
1
Blender
Zipper Manifold
Change the flow of the fluid
Chiksan (Swivel Joint)
Distributes fluid from blender to the pumps and from the pumps to the wellhead
Bleed-off Valves
Prevents flowback from well to frac equipment
Pressure relief systems
Bleeds off pressure from frac equipment
Missile (Manifold)
Safety valves to ensure pressure does not exceed max allowable pressure.
Check Valve
Connects wellheads to allow for faster operations
Where is the transducer for pressure A?
After the check valve
Before the check valve
On the wellhead
On the blender
What iron rating to use for a line expected to hold 13500 psi?
1502 frac iron
1002 frac iron
Neither
Where is the transducer for the zipper manifold?
Wellhead
On the bleedoff valves
On the flowback iron
East side of the manifold
What are the hoses on the suction side of the blender hooked to?
Water Supply
Sand Silo
Chemical Totes
Missle/Monoline
What is the size of a standard tote?
190 gal
100 gal
330 gal
280 gal
Generally, which sand has higher density, 100 mesh or 40/70?
100 mesh
40/70
About the same
Approximately how many pounds of sand does a sand truck carry? How many trucks to fill up a Solaris silo?
48,000 lbs, 7 trucks
47,500 lbs, 7 trucks
48,000 lbs, 8 trucks
46,600 lbs, 8 trucks
What are the engines on the blender used for?
Chemical Pump
Hydraulic System
Suction Pump
Proppant Pump
Discharge Pump
What part of operations could cause a drop in the inline such as in the plot below?
Pump failure
Wireline perforating
Sand hopper went empty
Iron failure
Describe what effect is happening during this section of the plot.
Screen Out
Water Hammer
Pressure Test
Normal Operations
What is a screen-out?
All the screens in the data van go black
Not enough sand sieves to test the particle size distribution of the sand
Blockage of flow in well, perforations, or fractures preventing continued frac operations
All of the above
What does it mean when the treater tells the crew to prime up?
Prime the engine with fuel
Fill the pumps and iron with water
Fill the hopper full of sand
Fill the chemical pumps and lines with chemical
What process happens after the line boss says, "Pop off closed, bleed off closed, line clear"?
Pressure testing
Finishing a stage
Pump maintence
Blender swap
Match the pressure types with the correct description.
Perforation friction pressure
Pressure at the wellhead also known as surface treating pressure.
Instantaneous shut-in pressure
Pressure exerted by the wellbore fluid due to depth and density.
Injection pressure
Pressure loss due to fluid friction.
Closure Pressure
Treating pressure + hydrostatic pressure - pipe friction - perforation friction
Bottom hole pressure
Friction due to fluid moving through restricted area of perforations
Hydrostatic pressure
Pressure caused by complex fluid path
Pipe friction pressure
Pressure when rate goes to zero.
Tortuosity pressure
The minimum pressure required to keep the fracture open.
Match the type of frac fluid component with its purpose
Biocide
Dissolves formation and increases fracture conductivity
Surfactant
Prevents bacteria growth
Corrosion inhibitor
Slowly breaks down FR to help with fluid recovery
Scale inhibitor
Reduces swelling in clay formations
Breaker
Links polymers to make a viscous fluid
Clay Inhibitor
Reduces friction in wellbore
Acid
Increases viscosity of frac fluid to carry proppant
Gel
Prevents mineral deposits from building up in the wellbore
Crosslink
Reduces surface tension of frac fluid
Friction reducer
Protects the wellbore from corroding
Select all the types of frac proppant
Resin coated sand
Playground sand
Recycled glass
Ceramic sand
Natural sand
Beach sand
What is the common SG of frac proppant?
2.55
2.85
2.75
2.65
What test is done, in the field, to analyze sand size?
Sieve Analysis
Centrifugal Distribution
Measuring with a caliper
Bucket Test
What should the pH of slickwater be?
Acidic
Neutral
Basic
Bleed off valves are located before the check valve.
True
False
Where are popoffs placed?
After the check valve
Before the check valve
On the zipper manifold
On the wellhead
On the blender
Which process is essential before resuming operation every time the line is broken for pumps swap or changing pieces of iron?
EOs taking a break
Pressure test
Report the change to the field supervisor
Record downtime on the excel
Why is it important for the treater to record the closure pressure of a well?
It helps determine the equalizing pressure for the next stage
The engineer will need it for documentation
The consultant will ask for it
It is not necessary
Treater
Controlling chemical setpoints and maintaining chemical pumps
Fluid Tech
Responsible for all the iron, open and closing the well, looking for leaks
Sand Operator
Often the outside supervisor, straps chemicals, moves ISOs, and calibrating chemical pumps.
ChemAdd Operator
Ensures hopper stays full of sand
Sand Coordinatior
Maintaines pumping rate
Line Boss
In charge of all electronics on site including: maintaining communications, pressure transducers, pump control boxes, and the datavan.
Pump Operator
Oversees the frac operation on their shift. Ensures operations run smoothly and efficiently.
E-Tech
Directs sand deliveries and offloading into the correct storage compartment.
What is the area within the high pressure zone called?
Red zone
Yellow zone
High pressure area
DANGER! STAY OUT!
What does a green hardhat represent?
Employee in training
Safety
Company man
Supervisor
What kind of gloves is required when handling frac iron?
Impact gloves
Mechanic gloves
Chemical resistant gloves
Rubber gloves
Which of the following are AST-required PPE? Select all that applies
Safety glasses
FR clothing
Steel toed boots
Face mask
Hard hat
Rain jacket
If they discover a pin hole leak on the suction manifold of the monoline, what type of NPT would it be considered?
Customer NPT, Misc Other
AST Maint, Misc Other
AST NPT, Iron
Customer NPT, Third Party
Classify the following into pump maintenance or pump failure (NPT)
Pump maintenance
Pump failure (NPT)
Packing/Plunger
Mechanical issue (overheating, drive shaft, etc.)
Seat & valves
Cracked fluid end
Water in fuel lines
Scheduled PMs
Unscheduled PMs
Which of the following is considered Customer NPT?
Iron
Greasing
Sand Equipment
Wellhead/zipper manifold
How much time from does it take to empty a full silo? Assume a 75 min cycle time, 120k lbs per sand type, an average truck size of 48,000 lbs, and 8 trucks per Silo.
3.20 hours
4.00 hours
240.00 hours
3.96 hours
In preparing to wrap up a Endeavor's job, the sand tracker says the amount of sand needed to complete the job is 355,431 of 100M and 246,025 of 40/70, how would you place your sand order?
7 loads + 19431 lbs partial of 100M, 5 loads + 6025 lbs partial of 40/70
7 loads of 100M, 5 loads of 40/70
5 loads + 6025 lbs partial of 100M, 7 loads + 19431 lbs partial of 40/70
7 loads + 40000 lbs partial of 100M, 5 loads + 6025 lbs partial of 40/70
How would you order 75000 lbs of 100M to complete a job?
Order a full load of 48000 lbs via Automatize, and 27000 lbs partial load thru the Field Supervisor
Order a full load of 48000 lbs via Automatize, and 27000 lbs partial load thru Nancy Russell
Order 2 partial loads of 37,500 lbs each via Nancy Russell
Order 2 full loads via Automatize and let the treater burn off or redirect to other fleet the 21000 lbs excess
What additional screens need to be set-up prior to starting job upon arrival to job location?
Generate ASCII Data
Report Manager
As Pump Schedule
Channel Inputs for Model
Chemical Additives
When setting up DataAcq, what needs to be checked in Job Header Information or else the job data will not be uploaded to the server?
Active Streaming
Transmit SimulFrac Secondary FPX
Mode > Auto-Upload
Use Mnemonic
Connect to FieldPro Live
To have engineer/treater/consultant names auto-populate on the report, where would you input the names?
Manually input them after report is generated
Report Manager
Channel Inputs for Model
Operations Header
As Pumped Schedule
Which of the following eFieldPro dashboards AST field engineer use to check whether frac plots and chems & sand straps are uploaded correctly?
Real Time Stream (Active)
Zoom-color by well
AST Shift Change Overview
Multi Stage View
When populating the Reference Sheet on the Engineering Report, what cell needs to be manually inputted?
Flush Volume
All of the Above
Fluid Type
Proppant Sand Codes
Select the option that has the following stage order.

1. 111-1
2. 212-1
3. 151-1
4. 252-1
5. 212-2
6. 111-2
7. 151-2
8. 212-3
What column should be hidden on the Field Ticket Sheet?
Rate
Gross Total
Discount Percentage
Discount Total
All of the above
You send out an stage update email and it says "Stage 1 of 52" when it should be "Stage 3 of 52". Which Excel file/tab do you need to check & correct?
Stage times
Morning Report
References
Data 2
AST does not charge the Endeavor directly for the amounts of FR and Surf, but does charge for Breaker, which usage quantities should be recorded on our Master & Data excel?
Only the Breaker since we charge them directly for it.
All the chems because we need to later disclose the chem quantities pumped
None, because Field Engineers don't do Field Tickets for Endeavor
The slickwater job calls for 0.5 on Ace Flow 3300, 1 on ME-350, 0.25 on ABK101. Select the correct fluid matrix
What is the maximum amount that should be remaining in an ISO when a delivery is getting offloaded into it?
1,500 gal
1,000 gal
2,500 gal
2,000 gal
How much lead time should generally be given for chemical orders?
6 hours
12 hours
10 hours
4 hours
At the end of the job, on what documents should the total sand used be the same?
Field Ticket
Inventory
Sand Tracker tab
Final PJR
Fluid Tech Report
How many hours ahead of start time is it best to schedule chem ISO delivery for a new job?
24 hours
6 hours
30 hours
12 hours
When should ISO pickups be scheduled?
12 hours from the job end time
6 hours from the job end time
At the same time as we you order ISO delivery for new location
As soon as the job ends
It is a good practice to hide the "Discount %" column on the Field Ticket before printing it out for signatures?
True
False
What part of the inventory must be zeroed out at the end of a job?
Acid
Friction Reducer
Surfactant
Sand
Fuel
According to engineering SOP, when should field engineers have the job folder uploaded to the AST's company drive?
Within 24 hours of the job's end date/time
within 36 hours from the job's end date/time
Anytime as long as it is before the next job start date
Have it saved locally, but only upload when asked to